Platinum is a new attractive project located beach front and within a short walking distance to the shops and restaurants of the town centre of Yalikavak.
Being built on a land with 270 degree panaromic view and facing west, Platinum has unobstructed views of two separate bays, town of Yalikavak, surrounding mountains, the Greek Island of Kalimnos, and the peninsula of Kudur. Because of limited seafront space and its close proximity to the town centre, Platinum is truly a one of a kind development. Platinum is an excellent development for those looking for the ideal holiday home and investment.
-
The building shall be built according to the reinforced concrete Project.
-
Sub-foundation shall be lean concrete mat foundation and shall be built incompliance with and as specified in the Project by using C25 concrete. St 3 steel shall be used.
-
All interior and exterior doors shall be mode from20-10-15 cm isobim blocks.
-
The roofs of the buildings shall be insulated against water and heat.
-
All exterior plastering shall be applied with mortar and on top shall be insulated against rain water and painted with silicon based point.
-
B-25 concrete shall be used for laying of floors and concrete floor slabs shall be used.
-
Interior walls shall be plastered with satin plaster and pointed with plastic paint.
-
Necessary wiring shall be fitted in the lounge and master bedroom for the satellite system.
-
Each room shall be fitted with a phone jack.
-
All materials to be used for electricity cabling & wiring and plumbing shall be of ISO 9001 and TSE (Turkish Standards Institute) standards.
-
Electricity transformer shall be installed at the site to configure the voltage of electricity.
-
Each room shall be fitted with piping and cabling for air-conditioning (installation and energy cables).
-
All windows shall have pvc window frames fitted with double glazing The window frames shall be a good quality Brand.
-
Swimming pool playground, resting places shall form the social facilities within the complex.
-
There shall be on outlet in the bathroom for safety razor.
-
All electricity outlets shall be ground-connected.
-
Sanitary units shall be white and accessories shall be chrome plated.
-
There shall be sufficient number of outlets in the lounge and the rooms.
-
Buildings shall be insulated against water.
-
In the kitchen, kitchen units shall be fitted both above and beneath the worktop. The bottom kitchen units shall be made from Mdf- lam and top kitchen unit shall be made from chipboard and the unit doors shall be laminate. The kitchen sink shall be chrome-lux with drain. Opposite the worktop shall be ceramic tiled.
-
Environmental arrangements and landscaping shall be practiced in harmony with the environment.
-
Fresh water piping shall be installed under plaster and the pipes shall be silent plastic pipes. Cold and hot water piping system shall be installed as specified in the Project. There shall be a communal water tank and a water pressure tank in the complex. Waste water pipes shall be connected to mains channel. There shall be a package treatment unit.
-
Low and high electricity current shall be installed as specified in the Project.
-
Cold water pipes shall be fitted to the front balconies of the apartments.
-
A postbox shall be fitted at the entrance of each apartment.
-
Environmental fighting shall be fitted according to the Project plan.
-
An artesian well shall be dug for the complex. There exists a well in the Project.
-
Each apartment shall be provided with appropriate water meter according to the Project.
-
The complex shall be provided with drainage system fort management of rain water.